Projects

Water Systems Installations

Tororo District: The construction of OWORI Memorial WASH project in Merikit Sub county, Tororo District.

  • The project entailed the installation of production wells, equipped with solar-powered pumping systems, to extract water and store it in a central reservoir with a capacity of 108,000 liters. Piped water is being distributed through four community stand taps, each equipped with four outlets. Additionally, a water kiosk has been constructed at the Merikit Market, and a total of 13 units of 8-stance double-sided drainable toilets have been built at the trading center and six institutions within Merikit Subcounty. Furthermore, a comprehensive piped water system has been established to serve the entirety of Merikit Subcounty. To ensure the effective operation and maintenance of the water infrastructure, water-users committees have been established and provided with training and maintenance toolkits.

Kitgum District: The Construction of Namokora, Lagoro and Mucwini Water and Sanitation Facilities in Kitgum District

  • The project involved the installation of transmission lines spanning a distance of 3 kilometers, as well as distribution lines covering over 18 kilometers. Additionally, a service line extending over 25 kilometers was established. The project also included the construction of three water tank reservoirs with capacities of 70 cubic meters, 70 cubic meters, and 50 cubic meters respectively. Electromechanical components such as submersible pumps, wiring, and generators were installed. Furthermore, a power extension of 1 kilometer was carried out, along with the construction of a water office, generator/pump house, and guard house. The implementation of the project involved the installation of over 30 public tap stands, as well as the connection of over 300 yards to the water supply network. Finally, the provision of tools and equipment required for the project was ensured.

Pader District: Construction of Piped Water Scheme in Porogali Trading Centre - Pader District

  • The project entailed the rehabilitation of transmission lines spanning a distance of 0.5 kilometers, as well as the distribution lines covering 1.8 kilometers. Additionally, a service line extending over 0.6 kilometers was restored. A 50 cubic meter pressed steel water tank reservoir was also rehabilitated. Electromechanical components, including submersible pumps, wiring, and a pump house/guard house, were upgraded as part of the project. Furthermore, eight public tap stands were refurbished. The project also involved the supply of necessary tools and equipment to support the rehabilitation process.

Installation of solar street lights

Pader District

Fabrication of screw conveyer

Awico fabrication floor-Lira

Erecting steel structures at

Mout Meru millers (U) Ltd

40m3 water tanks at Hight of 15 meters tower in Refugee settlement and host communities in Imvepi

Arua City

Civil Engineering Works

Lira City Construction of Twin Staff House at Adagnyeko P/S in Bata Sub County

  • The project involved the construction of a Twin Staff House at Adagnyeko Primary School in Bata Sub County. The construction process encompassed the development of the sub-structure, superstructure, roofing, as well as the installation of doors and the application of paint.

Lira City Construction of 5 classroom Block at Amonoloco P/S School

  • The project entailed the construction of a 5-classroom block at Amonoloco Primary School. The construction process included the development of the sub-structure, superstructure, roofing, as well as the installation of doors and the application of paint.

Solar Systems

Pader District: Installations of solar street lights in Pader district